Building in 2023?

Passive Timber Frame Home in Co. Tipperary

Build Date

Date

2020

Package

Package

Passive

Build Size

Build Size

2580ft2

A Little Bit About This Build..

A modern take on a traditional two storey dwelling constructed in County Tipperary. This build was situated on a large plot, featuring large uninterrupted glazing and a vast sliding patio doors.

This client chose our Passive Package incorporating a 140 x 38mm timber frame stud fully insulated with 140mm PIR and a further 50mm to the face of the stud eliminating any cold bridging.

“A passive standard two storey timber frame home built on a large rural plot in County Tipperary.”

Take a Look..

Quick 48 Hour Quote

Simply Fill in the Form Below & We'll Be in Touch!